Tesseract AI  /  Australia

Tesseract AI.
Accelerating AI deployment through smarter power

BESS-integrated National portfolio

We build the infrastructure.
You bring the compute.

Tesseract develops BESS-integrated, AI-ready data factory infrastructure across Australia. We secure the site and grid connection and provide resilient power, high-efficiency cooling, connectivity and intelligent energy control.

Aerial view of an AI-ready data factory campus: chiller banks and switchrooms around the main hall, with a grid substation alongside.
Modular data centre Battery energy storage Grid connection

20+

Site

Planned sites across Australia

<18

Months

To operational readiness

200+

MW

Data centre portfolio pipeline

99.95%

SLA

Designed to hold through grid events

Scale

Australia’s distributed AI data centre platform backed by energy storage

Tesseract AI is building a national portfolio of modular, AI-ready data centres across Australia’s major metropolitan markets. With a development pipeline exceeding 200 MW, we’re accelerating AI infrastructure by unlocking power where it’s needed most.

We combine our expertise in grid connections, energy storage and Virtual Power Plant platform to deliver a network of sites with exceptional:

  • 01

    Speed to build

  • 02

    Adapting existing grid infrastructure where possible

  • 03

    Access to low-cost energy

Target portfolio — major Australian markets

Planned site

Perth Adelaide Melbourne Sydney Brisbane

Indicative locations. Tesseract is developing a national portfolio of modular AI data centres across Australia’s major metropolitan markets.

The problem

AI demand is accelerating. The grid is the constraint.

AI is creating unprecedented demand for data-centre capacity, but the primary constraint is no longer compute hardware — it is access to power.

Traditional data-centre development relies on securing large blocks of grid capacity in the locations where demand is already concentrated. That means long connection queues, fewer viable sites, and increasing pressure on already constrained networks.

The result is a growing gap between where AI compute is needed and where new capacity can realistically be delivered.

Closing that gap requires a different approach to power.

The widening gap

AI compute demandAvailable grid capacity

Today Forecast horizon Low High THE GAP

Illustrative. Demand for AI compute is outpacing the rate at which new grid capacity can be connected in the locations where that compute is needed.

Transmission towers and power lines silhouetted against an orange sunset.

Our Solution — TESSERACT Powered Shell+

We unlock AI capacity where the grid is constrained.

A conventional powered shell provides the building and grid connection. Our solution, Powered Shell+, goes further — integrating battery storage and flexible-load control from the outset to make better use of constrained power.

By designing the site around the available grid capacity, we can unlock connection pathways, reduce exposure to energy costs and make viable locations that conventional data-centre development may overlook.

Development pathway

  1. 01

    Grid assessment

    Network capacity and constraints mapped before anything is committed.

  2. 02

    Land

    Sites secured where that capacity, fibre and services already reach.

  3. 03

    DA

    Development application lodged and planning approval secured.

  4. 04

    Grid connection

    Connection agreement progressed with the network operator.

  5. 05

    Build

    Modular construction to a repeatable design.

  6. 06

    Operate

    Energised and run under FlexDC, holding service targets through grid events.

A Tesseract modular AI data centre with co-located battery energy storage units on a landscaped industrial site at dusk, with a city skyline behind.
Battery energy storage integrated at the site — the component that makes a constrained grid connection viable.

How we unlock a site

  • 01

    Site origination

    We source and develop strategically located sites with access to existing power, fibre, land and infrastructure.

  • 02

    Grid expertise

    We identify viable connection opportunities and navigate the process of bringing new load onto constrained networks.

  • 03

    Energy storage and flexible load

    We design battery storage and flexible load in from the outset to reshape a site’s demand profile, helping create an operating envelope that works within network constraints. This can make connections viable in locations conventional data-centre development may overlook.

  • 04

    Repeatable development

    We turn each opportunity into a standardised, modular AI data-centre build — accelerating deployment and creating a repeatable model that can scale across markets.

At a glance

FeatureIndicative design
Site size3 MW+
DeploymentRepeatable modular design
Rack densityConfigurable for high-density AI compute
CoolingHigh-efficiency air, or liquid-cooling-ready
Power architectureGrid + BESS + resilient site distribution
ConnectivityCarrier-neutral, diverse-fibre-ready
ControlFlexDC power-envelope and workload coordination
Customer scopeServers, GPUs, AI platform and compute operations
ExpansionMulti-site regional capacity

Who does what

Tesseract

Delivers the infrastructure layer

  • Site development
  • Grid connection
  • BESS
  • Electrical infrastructure
  • Cooling
  • Fibre-ready connectivity
  • Security
  • Data halls
  • Energy management
  • Flexible load control

You

Run the compute

  • IT equipment and GPUs
  • AI platforms
  • Cloud services
  • Your customers

FlexDC

FlexDC turns constrained power into usable compute

FlexDC is Tesseract’s proprietary power-control layer and part of the Powered Shell+ package. It continuously balances grid supply, battery storage and compute demand to maximise the usable IT load on a power-constrained site — while keeping the site inside its service targets and its connection agreement.

Rather than treating it as a fixed ceiling, FlexDC manages power as a resource that changes across the day.

What it delivers

01

Lower energy cost

Shifts consumption to lower-price periods and charges batteries when electricity is cheapest — and, typically, cleanest.

02

More compute per connection

Increases usable IT load on a constrained site through coordinated battery and demand management.

03

Protected service targets

Supports availability through intelligent battery dispatch and controlled load management.

04

Portfolio-scale optimisation

As the network grows, FlexDC Portfolio Cloud coordinates multiple sites and battery systems as a single intelligent energy network — a virtual power plant (VPP) of distributed data centres.

A day on site — 24 hours

Grid price Grid draw Battery supply

Grid price Site load Charge Discharge 00:00 06:00 12:00 18:00 23:00

Illustrative. Battery storage and flexible load control shift consumption away from high-cost, high-demand periods — and charge when energy is cheapest and cleanest.

How it works

  • 01

    Forecast

    FlexDC continuously forecasts site power capacity using expected IT demand, battery state of charge, electricity prices, grid constraints and renewable generation where available.

  • 02

    Optimise

    FlexDC decides when to charge or discharge on-site batteries, how much reserve to hold for critical periods, and how to allocate available power across the facility.

  • 03

    Balance

    When power is constrained, FlexDC dynamically adjusts GPU power budgets across workloads so service continues with the most efficient use of what’s available.

Power envelope → Site dispatch → Compute response

DNSP / AEMO / Retailer

FlexDC Portfolio Cloud

FlexDC Site Controller

Tenant Workload System

Site controller

Meter & switchgear

Site controller

BESS / PCS / UPS

Site controller

Cooling / auxiliaries

Tenant

GPU cluster / DCGM

Local controller remains authoritative for electrical safety and connection compliance.

Workloads

Why distributed inference

01

Lower latency and proximity to metropolitan demand.

02

Incremental capacity that can be delivered faster than a hyperscale campus.

03

Regional resilience and workload portability across independent sites.

Designed primarily for inference, AI application hosting, sovereign workloads, rendering and other geographically distributable compute — not tightly coupled, hyperscale training clusters requiring a single large RDMA fabric.

Availability

Flexible grid can provide a credible enterprise SLA

Tesseract’s architecture is built around independent power and network failure domains at each site, plus regional capacity across multiple sites. Customers deploy and operate compute across more than one site; in a grid event, eligible workloads are redirected between independent domains and the customer service is designed to continue.

The SLA is delivered through combined site resilience and a regional platform

99.95%

Initial contractual regional SLA

99.99%

Mature enterprise SLA target

How the SLA works with a flexible grid connection: Firm capacity remains protected at all times; flexible and burst capacity move first. A flexible-grid restriction is not SLA downtime unless contracted regional capacity or latency is unavailable.

About Tesseract AI

Unlocking power for AI.

Tesseract AI develops power-ready infrastructure for distributed AI computing. We help address the power and grid-connection constraints that limit AI growth, creating the foundations for computing capacity to expand closer to demand.

Our principal infrastructure solution, Tesseract Powered Shell+, brings together sites, grid connections, battery storage, modular data-centre facilities and intelligent energy management. This gives specialist operators and tenants a practical path to deploying AI capacity while retaining control of their computing equipment, software and AI services.

Our vision is a distributed network of AI-ready infrastructure that grows in harmony with the electricity grid. We begin every project with a credible route to power and design for reliability and flexibility, pursuing faster delivery through sound engineering and disciplined development.

Partnership shapes how we work. By bringing together expertise across energy, technology, property and finance, we aim to turn viable power opportunities into lasting infrastructure. Efficient energy use, renewable-energy integration and constructive engagement with local communities guide our approach to responsible growth.

NVIDIA AI Grid

Power for the AI grid.

NVIDIA describes an AI grid as distributed, interconnected AI infrastructure — AI factories, regional hubs and edge sites orchestrated as a single pool of capacity, with each workload run where it runs best and inference placed close to the users, agents and machines it serves.

A grid like that has to stand on something. Tesseract is building that footprint in Australia: a national portfolio of modular, AI-ready sites developed around the grid capacity actually available, where Powered Shell+ and FlexDC make a connection work that a fixed load could not.

Tesseract AI is a member of the NVIDIA Inception program, which supports companies building on the NVIDIA platform.

Tesseract AI and the NVIDIA Inception Program

Leadership

The team behind the pipeline.

Tesseract AI is led by a team drawn from energy markets, grid connection, data-centre development, software and infrastructure finance, supported by advisors in technology and law.

  • Chong Tong

    Chong Tong

    Founder & CEO

  • Edward Tong

    Edward Tong

    Co-founder & Head of Strategy

  • Volkan Demir

    Volkan Demir

    Head of Business Development

  • Will Gao

    Will Gao

    Head of Operations

  • Silas Huang

    Silas Huang

    Product and Solution Lead

  • Meet Patel

    Meet Patel

    Grid Connection Lead

  • Meet Savaliya

    Meet Savaliya

    Software Development Lead

  • Andrew Mears

    Andrew Mears

    Technology & Strategy Advisor

  • Sophia Tong

    Sophia Tong

    Legal and Financing Advisor

Our partners

Delivered with proven partners.

Tesseract AI works with established partners across energy, technology and infrastructure. Their platforms, equipment and expertise sit behind the grid connections, storage systems and control layer we deploy on every site, selected for proven performance at utility scale and long-term support in Australia.

  • NVIDIA Inception Program
  • SwitchDin
  • ComAp
  • Endeavour Energy
  • HyperStrong
  • Rayo

Partnerships

Work with Tesseract

Whether you need AI capacity, want to deploy capital, have a site or power opportunity, or can help us deliver infrastructure, there are multiple ways to work with Tesseract. We bring together power, infrastructure, capital and compute to accelerate the development of AI infrastructure.

01

Rent AI-Ready Capacity

Bring your compute requirements, location preferences, rack density and service-date requirements. We provide the AI-ready powered infrastructure and energy platform required to deploy your compute.

Discuss your requirements

02

Invest in Tesseract

Invest in individual developments or participate in our wider portfolio of AI infrastructure projects. Opportunities are built around secured sites, power capacity, defined development milestones and contracted customer demand.

Invest

03

Partner on sites & power

Bring a site, grid capacity or an energisation opportunity. We bring the customer relationships, development expertise, capital and delivery capability to turn power into AI infrastructure.

Propose site or opportunity

04

Supply and deliver

Join our delivery ecosystem as an engineering partner, equipment supplier, technology provider, contractor or infrastructure specialist. Work with Tesseract through defined pathways to deliver the infrastructure our customers need.

Become a delivery partner

Get in touch

Let’s chat about your goals.

Need help? Have a question? Let’s chat about your goals and how we can help make them a reality.

    Tesseract

    Address

    140 Ashley St, Underdale SA 5032